Get the Servers off the floor.

Pretty much everything is on the floor with the exception of (2) 24port patch panels, a few switches and a wireless access point. The equipment has to be climbed over to reach anything and there is no room to store anything or work in this closet. This is actually AFTER we removed all the junk equipment out of the room that wasn’t even in production.

To fix it up, we added larger network board, installed patch and power management systems. We made a custom shelf and work bench to support server and network equipment. Speaker equipment moved to it’s own shelf, monitors are stacked to allow easy access to DVR and computer. The stool is now the only remaining piece of equipment on the floor.